GYM FLOOR REPLACEMENT SPECS
ELGIN PUBLIC SCHOOLS GYM FLOOR PROJECT SPECIFICATIONS
The project specifications call for it to be a tear out and new floor replacement project. The current floor is 40 years old and is surrounded on all 4 sides by tile. The new floor is to go beyond the tile border and go wall to wall in all four directions (including under current bleachers). The floor is to be a maple or similar product wood that is as light in color/shade as possible, with wording down each sideline (1 half court per side); and wording in the baseline paint (bare floor would be wording so could be easily changed). Work is to be done between May 25th and July 11th of this year (the sooner the better) you may specify general time frame if you would like.
Any pictures, renderings, or likeness of what the floor may look like would be VERY effective/appreciated. Our athletic mascot is the Wolfpack and town Obviously is Elgin. The Wolfpack colors are red and black. Maybe ELGIN on sides Wolfpack in ends…. Or could flip wording spots….and maybe have or show “paint” in lane area or darker stained area and logo or Capitol E of some sort at half court jump circle? Open to different designs…There would be minimal cross court lines---maybe some “Tic” marks to utilize with floor tape for cross court vball/basketball…
A Separate component bid for the removal/demolition of the current floor would be appreciated as well. If not a delicate task we do have local possibilities for demolition.